Chapter 11

Internal Finishes

Introduction

In most new timber frame homes, plasterboard provides the fire protection to the timber frame superstructure. Plasterboard also provides acoustic resilience, waterproofing, moisture control and is the substrate for final finishes to walls and floors, ensuring homes meet regulatory standards and perform as expected.

Key considerations are:

  1. Fire safety
  2. Installation and other requirements
  3. Penetrations
  4. DIY & repairs

Plasterboard Fire Safety

Plasterboard is a critical safety feature in all timber frame homes. This provides the fire protection to the timber frame superstructure. Differing plasterboard specifications are required for external walls, party walls and internal loadbearing walls, floor and roof elements.

There are three suppliers of gypsum-based plasterboard in the UK: British Gypsum, Siniat and Knauf. In addition, gypsum fibreboard boards, supplied by Fermacell, offer an alternative plasterboard solution.

It is essential that the structural elements within timber frame buildings are protected by elements that have proven fire resistant performance.

Key considerations are:

  1. Only use fire-tested wall, floor and roof make ups
  2. Only use solutions supported by recognised guidance or third-party product certification.
  3. Always use correct fixings, centres and never overdrive them
  4. Don’t use damaged or wet boards
  5. If in doubt, check: never fix if unsure
  6. Check as you go: use QA checklists and regularly inspect/audit completed work
  7. Use a plasterboard schedule and mark on site the differing board locations and specifications

 

Fire tested solutions

The STA and TRA provides recognised industry guidance, with a wide range of fire-tested solutions.

Plasterboard Installation & Other Requirements

Plasterboard is almost invariably screw-fixed to the timber studs, floor joists and roof elements after insulation and first-fix operations are complete. Often additional service zones are used to simplify service routing, access and fixings. If in doubt check, never fit boards if unsure.

It is very important to use the correct fixings, specifications and installation is done correctly. Damaged or wet boards must never be used. Never overdrive fixings.

Plasterboard also provides acoustic resilience, waterproofing, moisture control and provides a substrate for final finishes to walls and floors, ensuring homes meet regulatory standards and perform as expected.

Key considerations include:

  1. Only use fire-tested wall, floor and roof make ups
  2. Only use solutions supported by recognised guidance Or other evidence of fire resistance performance
  3. Always use correct fixings, centres and never overdrive them
  4. Don’t use damaged or wet boards
  5. If in doubt check: never fix if unsure
  6. Check as you go: use QA checklists and regularly inspect/audit completed work
  7. Use a plasterboard schedule and mark on site, differing board locations and specifications

Penetrations

Penetrating plasterboard walls or ceilings that provide fire protection should be avoided. Where penetrations cannot be avoided (greater than 40mm dia.), firestopping will be needed. Often additional service zones are used to simplify service routing, access and fixings.

Fire testing carried out by the STA demonstrates that where a single double socket is installed in a timber frame wall panel the fire resistance performance targeted is unlikely to be reduced. However, where more than one socket is installed within a single stud bay, intumescent ‘puddy pads’ should be used unless evidence demonstrating these are not required is available.

Downlighters in timber frame floors, must be fire tested suitable for 30 and 60min REI fire safety compliance requirements.

Pipe Boxing & Ceiling Ducts

Vertical and horizontal building services, such as plumbing and ventilation, are often concealed in lowered ceilings or pipe boxing. It is important that the fire protection is fitted to the timber frame loadbearing elements fully behind and prior to the installation of pipework and closing in.

It is not acceptable to use the secondary plasterboard cladding the pipe or duct for fire protection, as this has not been fire-tested for this application. Careful attention to build sequence, construction process and pre-inspection of work is needed.

Vertical pipework passing through a 60 REI fire rated compartment floor will require firestopping. This is achieved by using appropriately fire-tested and certified fire collars suitable for use timber floor construction.

Key considerations:

  1. Always plasterboard behind vertical and horizontal ducts, to maintain the fire protection line to the timber frame superstructure.
  2. Never rely on the plasterboard cladding the finishing of the duct for fire protection
  3. Ensure build sequence and inspections are done, prior to installing pipes and boxing
  4. Use toolbox talks to inform plasterboard installers of this need
  5. Always use fire collars on vertical pipework passing through 60-minute REI-rated compartment floors
Further information can be found within plasterboard installation guides. Some examples:

British Gypsum White Book Installation Guide

Knauf Plasterboard installation guide

Some examples of firestopping providers:

Rockwool

Tenmat

Quelfire

DIY and Repairs

Simple DIY and repair jobs can be easily carried out in a timber frame home. Timber frame is suitable for hanging pictures, cabinets, televisions, adding sockets, fixing holes and dents and other DIY related activities. As with all new homes, simple maintenance and upkeep will keep things in good order.